Public Works Wastewater Utility Collection System
As the gateway to the City of La Center, this Water Reclamation Facility has been expanded as an attractive and cost effective addition to the La Center landscape for the benefit of the community and the environment alike. The City of La Center needed to expand its wastewater treatment capacity to meet the needs of its growing community including, improving performance and water quality – all on a highly visible 0.75 acre site. The innovative design and architectural features have been recognized by the Association of Civil Engineers; Oregon and Washington Chapters – Receiving a Silver Award in Washington State for “Future Value” to the Engineering Profession and Perception by the Public.
The expansion increased capacity from 1 to 3 million gallons per day (easily expandable to 6 mgd in the future). The budget for design and construction of the upgrade was estimated to cost $13,700,000. Actual costs to complete the construction were $12,568,936. The expansion was funded through a 20-year, 0.5% loan from the Washington Public Works Trust Fund.
The new facility uses an advanced Membrane Bioreactor (MBR) technology. This system provides improved environmental performance and economy in construction and maintenance costs.
Award-winning facility treating 1 to 3 million gallons of wastewater a day for our community.
Energy Savings
Potable Water Savings
Natural Gas Savings
Under Budget
Energy Rebate
Future Value
Sustainable Construction
Sustainable Bi-Products
Socially Acceptable
Contact Our Team
Public Works & Community Development Director, BSCE, MBA, Tracy Coleman
Wastewater Supervisor, Nate Swyers
Wastewater Operator, Bill Birdwell
Wastewater Operator, Emery Oldham
Wastewater, after hours, immediate emergency only, on call number, 360-524-3950